Many of you have now seen that the kitchen is about 95% done (read more here). However having an amazing all-new kitchen like this:
Puts some rather harsh perspective on the rest of the house:
Ah, yes. The living room. Not too much has changed since we bought the house 8 months ago when it looked like this:
Except that we started to try to update on our own and found under the 80s wallpaper that we also had some 60s wallpaper:
So her room is also getting the drywall treatment. Along with the walls in the living room and Sydney’s room, we’re having the contractor demo the acoustical tile ceiling which looks like this:
And having them install a new crown molding since the existing one was dinky and not really salvageable. Whew! Is that enough or what? Interestingly, the estimate for the work was only a few days which seems crazy compared to how long the kitchen has taken! But the good news is that the work should be done before we move in which is great since anyone who has lived through drywall work knows it is super dusty and no fun at all!
I’ll be sure to post pictures as soon as I can. I’m so excited to see the transformation!
Cheers,
G
So excited to see this! You’ll just love having the entire house feel fresh and new. I love those windows by the way, very unique!
Thanks Mary! Yes, the windows are really lovely. They are original though and are tough to deal with–and they also don’t work with window air conditioner units, so it will be a hot summer! Unfortunately I think they’ll need to be replaced before too long, but I’d love to match the style if I can!
Cheers,
G
Pingback: Getting started on that 70s basement | the2bedroomblues